{"id":7,"date":"2016-10-06T15:56:43","date_gmt":"2016-10-06T15:56:43","guid":{"rendered":"https:\/\/wellesleyps.org\/schoolcommittee\/?page_id=7"},"modified":"2026-06-16T20:30:27","modified_gmt":"2026-06-17T00:30:27","slug":"home","status":"publish","type":"page","link":"https:\/\/wellesleyps.org\/schoolcommittee\/","title":{"rendered":"School Committee"},"content":{"rendered":"\n
\n
\n
\"\"
L to R: Robert Sullivan, Illana Nissenbaum, Niki Ofenloch, Linda Chow, Costas Panagopoulos. Not pictured: Joanne DaSilva Moreira<\/figcaption><\/figure>\n<\/div>\n\n\n\n
\n

What’s New<\/strong><\/h2>\n\n\n\n

RECENTLY UPDATED POLICIES<\/strong><\/p>\n\n\n\n

Voted at the January 20, 2026 Meeting:<\/em><\/p>\n\n\n\n

JG-R – Elementary Transfer Option Procedure<\/a><\/strong><\/p>\n\n\n\n

Voted at the February 24, 2026 Meeting:<\/em><\/p>\n\n\n\n

Policy ADF – Wellness Policy<\/a><\/strong>
Policy ADF-R Wellness Policy Implementation Guidelines<\/a><\/strong><\/p>\n\n\n\n

Voted at the March 24, 2026 Meeting: <\/em><\/p>\n\n\n\n

Policy – JBB Educational Equity<\/a><\/strong>
Policy JECA – Middle School Pathway Exploration<\/a><\/strong><\/p>\n\n\n\n

<\/p>\n\n\n\n

FEASIBILITY STUDY – AIR CONDITIONING<\/strong><\/p>\n\n\n\n

无尽资源采集 Town Meeting unanimously approved Article 18 at the 2025 Annual Town Meeting, appropriating up to $182,000 for a comprehensive study of options for air conditioning at the Bates, Fiske, Schofield schools and 无尽资源采集 Middle School. <\/p>\n\n\n\n

Update on Feasibility Study<\/strong>: At its December 9, 2025<\/a> meeting the School Committee received an update on the Feasibility Study<\/a>. The update included details of three system options – VRF (full building A\/C), heat pumps, and window units. Information on cost, electrical requirements, sustainability considerations, annual operating costs, pros\/cons of each option and project schedules is included in the presentation. <\/p>\n\n\n\n

At its December 16, 2025<\/a> meeting, the School Committee voted unanimously to move the feasibility study forward with window unit option for all four buildings. Additionally, on a parallel track, the Committee stated it would continue to investigate a larger HVAC project at Bates that would include all electric heating and cooling systems. This was discussed as a possible project due to the age of the Bates school and routine HVAC work that is currently planned.<\/p>\n\n\n\n

Current Project Timeline<\/strong><\/p>\n\n\n\n